LogForum

>Scientific Journal of Logistics<

Język polski English Deutch sprache

Issue 2/ 2011, article 5

Authors: Agata Mesjasz-Lech

Title: FORECASTING OF DEMAND FOR DIRECT PRODUCTION MATERIALS AS THE ELEMENT OF SUPPLY LOGISTICS OF THERMAL POWER PLANTS

Keywords: inventory management, utilitarian value of data, forecasting, forecasting methods

Abstract:

The paper highlights the problems associated with the process of forecasting realized within the supply logistics in thermal power plants. The theoretical part focuses on the importance of forecasting of inventories of raw materials in thermal power plants and the quality of logistics decisions determined by utilitarian value of data obtained, stored, processed and transmitted within the logistic system. The practical part presents the results of studies conducted in one of the thermal power plants in the south of Poland and the results of forecasting of the demand for the materials directly used in manufacturing process.

Full text available in in english in format: Adobe Acrobat pdf article nr 5 - pdf

Streszczenie w jezyku polskim Streszczenie w jezyku polskim.

Zusammenfassung in Deutsch Zusammenfassung in Deutsch.

For citation:

MLA Mesjasz-Lech, Agata. "Forecasting of demand for direct production materials as the element of supply logistics of thermal power plants." Logforum 7.2 (2011): 5.
APA Agata Mesjasz-Lech (2011). Forecasting of demand for direct production materials as the element of supply logistics of thermal power plants. Logforum 7 (2), 5.
ISO 690 MESJASZ-LECH, Agata. Forecasting of demand for direct production materials as the element of supply logistics of thermal power plants. Logforum, 2011, 7.2: 5.
EndNote BibTeX RefMan
© Wyższa Szkoła Logistyki, ul.E.Estkowskiego 6, 61-755 Poznań, tel. 061 850 47 81, fax. 061 850 47 89